0ad76ea8b036e930eda105993c24d748c391ab53
avt_pmpower.sh runs AVTCMD -module pmm "get_pmdata()" and summarizes SktPwr, PPT Fast / Slow against their limits, and MemPwr. -p takes the AVTCMD path, -q drops the raw PM table. Exit 2 = AVTCMD missing, 3 = AVTCMD failed, 4 = nothing parsed. The values are SMU telemetry, not a measurement. Script 4 calls it every round after the two TH6_SWB power readbacks, so switch rails and CPU package power sit side by side in each sample. AVT is under NDA and not shipped in Blanton_Script. It has to be unpacked on the DUT at ~/AVT_Linux_NDA_2.8.37/ beforehand; otherwise the call exits 2 each round and the loop continues without the reading. Without -q the full PM table is logged once a minute. Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01UniUXkxgCG2Ty74advL8Pd
Description
Blanton Tera Term TTL reliability test
4.9 MiB